Jump to content

Rolling road day - South Cambs


Recommended Posts

  • Replies 101
  • Created
  • Last Reply

Top Posters In This Topic

  • 2 weeks later...

at this rate im going to have to run my poorly vento cant wait to get my teeth into it now . i have my doors on the base units in my kitchen and the all the lower infills done now . Its only been 4 months so far you cant belive how nice it is to have a sink again lol. just the top units to tinker with doors on and tile the walls and its finished . Then i can start my vento only 6 months later than planed lol

Link to post
Share on other sites

to be fair i have moved stud walls blocked a door up and put a window in . replaced the ceiling tiled the floor the only thing i have had done is electrics the worktop and the plastering . the rest of it has been takcked by myself and my old man mind if it was not for the hours he has put in i would still be a long way off .

Link to post
Share on other sites

×
×
  • Create New...